2015
-
Theoretical and practical fundamentals
Handbook on Project Management and Scheduling Vol. 1 (Springer International Publishing), pp. 411-427
2012
-
Production scheduling in a market-driven foundry: A mathematical programming approach versus a project scheduling metaheuristic algorithm
Optimization and Engineering, Vol. 13, Núm. 4, pp. 663-687
2011
-
A double genetic algorithm for the MRCPSP/max
Computers and Operations Research
-
An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags
Journal of Scheduling, Vol. 14, Núm. 4, pp. 391-406
-
Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems
Computers and Operations Research
2009
-
Resource-constrained project scheduling for timely project completion with stochastic activity durations
Production and Operations Management, Vol. 18, Núm. 4, pp. 459-474
-
Scheduling projects with limited number of preemptions
Computers and Operations Research, Vol. 36, Núm. 11, pp. 2913-2925
-
Using RFID information in routing and sequencing warehouse operations
WORKSHOPS PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON INTELLIGENT ENVIRONMENTS
2008
-
A hybrid genetic algorithm for the resource-constrained project scheduling problem
European Journal of Operational Research, Vol. 185, Núm. 2, pp. 495-508
-
An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem
International Journal of Production Research, Vol. 46, Núm. 22, pp. 6231-6249
-
Different codifications and metaheuristic algorithms for the resource renting problem with minimum and maximum time lags
Studies in Computational Intelligence, Vol. 153, pp. 187-202
-
Meta-heuristics for stable scheduling on a single machine
Computers and Operations Research, Vol. 35, Núm. 7, pp. 2175-2192
-
Pre-emption in resource-constrained project scheduling
European Journal of Operational Research, Vol. 189, Núm. 3, pp. 1136-1152
2007
-
A genetic algorithm for the resource renting problem with minimum and maximum time lags
Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics)
-
Heuristic procedures for reactive project scheduling
Computers and Industrial Engineering, Vol. 52, Núm. 1, pp. 11-28
-
Planificación de la producción en una empresa de contrachapado
Procedimientos metaheurísticos en economía y empresa (Asociación Española de Profesores Universitarios de Matemáticas para la Economía y la Empresa (ASEPUMA)), pp. 285-302
-
When it is worthwhile to work with the stochastic RCPSP?
Journal of Scheduling, Vol. 10, Núm. 3, pp. 153-166
2006
-
Due dates and RCPSP
International Series in Operations Research and Management Science (Springer New York LLC), pp. 79-104
-
Justification technique generalizations
International Series in Operations Research and Management Science (Springer New York LLC), pp. 205-223
2004
-
Algoritmos heurísticos para el RCPSP con fechas de entrega
XXVIII Congreso Nacional de Estadística e Investigación Operativa: [archivo de ordenador] Cádiz, 25-29 de octubre de 2004